Flyover bridge in Poznań

Due to the insufficient load-bearing capacity of the existing permanent crossing, we delivered a temporary bridge which, when installed directly above the existing bridge, will enable the passage of heavy equipment (100% Eurocode LM1).

Share on:

Projektdata

Lösning
Elementbro
Typ
JSK-JBB
Längd
13,5m
Bredd
3,6m
Trafiklast
Eurocode LM1